One cubic yard in retail packages
Geometric yield with zero waste. The purchase column rounds up only when a full bag is required.
| Product or container | Volume each | Exact count | Whole units |
|---|---|---|---|
| Concrete mix, 80 lb | 0.60 ft³ | 45 | 45 bags |
| Concrete mix, 60 lb | 0.45 ft³ | 60 | 60 bags |
| Fast-setting mix, 50 lb | 0.375 ft³ | 72 | 72 bags |
| Concrete mix, 40 lb | 0.30 ft³ | 90 | 90 bags |
| Mulch bag | 2 ft³ | 13.5 | 14 bags |
| Mulch bag | 3 ft³ | 9 | 9 bags |
| Gravel or sand bag | 0.50 ft³ | 54 | 54 bags |
| Topsoil bag | 0.75 ft³ | 36 | 36 bags |
| US five-gallon pail | 0.6684 ft³ | 40.40 | 41 pail fills, last partial |
One cubic yard by weight
Illustrative bulk density in US short tons per cubic yard. Water content, particle size and packing affect the actual scale ticket.
| Material | Example tons/yd³ | Approximate pounds |
|---|---|---|
| Crushed stone | 1.40 | 2,800 |
| Dry screened topsoil | 1.10 | 2,200 |
| Wet topsoil | 1.30 | 2,600 |
| Dry sand | 1.35 | 2,700 |
| Damp bedding sand | 1.50 | 3,000 |
Measure square feet first
Use length × width for a rectangle. For a triangular area use base × perpendicular height ÷ 2. Divide an L-shaped bed into two nonoverlapping rectangles. Applying one average depth works only when both pieces need essentially the same layer.
Worked example for a 12-by-15-foot bed
The bed is 180 square feet. At 3 inches it takes 45 cubic feet, or 1.67 cubic yards. Add 10% to get 49.5 cubic feet. A 2-cubic-foot bag option takes 25 whole bags, while a 3-cubic-foot option takes 17. Each count covers the entire bed.
Bring the units onto the quote
Record whether the vendor uses a US short ton, metric tonne, loose cubic yard or a finished-yield bag. A 2,000 lb short ton and 1,000 kg metric tonne produce different order quantities. Compare before-tax, delivered totals for the same finished volume.