Quick answer
A nominal 80 lb bag yielding 0.60 cubic feet supplies one forty-fifth of a cubic yard. At the corresponding 0.45 and 0.30 cubic foot yields, a yard needs 60 of the 60 lb bags or 90 of the 40 lb bags. Choose bags by finished yield and compare the total handling weight.
Project tool checklist
- Bagged concrete mix
- Mixing tub
- Graduated water pail
- Mixing hoe
Quick reference table
Rectangular slabs, before waste. Each bag column is a separate whole-order option. Material budgets use $6.5 per 80 lb bag.
| Slab (ft) | Depth (in) | Volume (yd³) | 80 lb bags | 60 lb bags | Bag cost |
|---|---|---|---|---|---|
| 8 × 8 | 4 | 0.79 | 36 | 48 | $234 |
| 8 × 8 | 6 | 1.185 | 54 | 72 | $351 |
| 10 × 10 | 4 | 1.235 | 56 | 75 | $364 |
| 10 × 10 | 6 | 1.852 | 84 | 112 | $546 |
| 10 × 12 | 4 | 1.481 | 67 | 89 | $435.5 |
| 10 × 12 | 6 | 2.222 | 100 | 134 | $650 |
| 12 × 12 | 4 | 1.778 | 80 | 107 | $520 |
| 12 × 12 | 6 | 2.667 | 120 | 160 | $780 |
| 12 × 16 | 4 | 2.37 | 107 | 143 | $695.5 |
| 12 × 16 | 6 | 3.556 | 160 | 214 | $1,040 |
| 16 × 20 | 4 | 3.951 | 178 | 238 | $1,157 |
| 16 × 20 | 6 | 5.926 | 267 | 356 | $1,735.5 |
| 20 × 20 | 4 | 4.938 | 223 | 297 | $1,449.5 |
| 20 × 20 | 6 | 7.407 | 334 | 445 | $2,171 |
| 24 × 24 | 4 | 7.111 | 320 | 427 | $2,080 |
| 24 × 24 | 6 | 10.667 | 480 | 640 | $3,120 |
How to use the Concrete Bag Calculator
- Measure the finished pour or enter its dimensions. Read the exact product’s mixed yield from the bag or data sheet.
- Choose your units, enter the measured dimensions, and review the live drawing. Set a waste allowance and enter local prices.
- Select one bag alternative. Check dry load weight and mixing capacity before planning pickup and use the manufacturer’s water instructions.
Formula & engineering reference
Finished cubic feet ÷ yield per bag gives the fractional bag count. Round up once, after waste. Handling weight equals whole bags × labeled dry bag weight. Water requirements depend on the specific mix and packaging.
Project questions
How many 50 lb bags make a yard?
At an assumed yield of 0.375 cubic feet each, 72 bags fill one cubic yard before waste. Fast-setting and specialty products can have different yields.
Can I add up the 40, 60 and 80 lb counts?
Each row represents the entire pour using one size. For a mixed load subtract the yield of the first size before calculating the second.
Can I use a five-gallon pail for measuring the pour?
One US five-gallon pail holds about 0.668 cubic feet to the brim. Roughly 40.4 full pails equal a cubic yard by volume.
How much does a one-yard order in 80 lb bags weigh?
Forty-five 80 lb bags weigh 3,600 lb dry, before packaging, water or equipment. Check vehicle and trailer ratings for the actual load.
Why does the bag count jump after a small change in depth?
Each count rounds up to a whole bag. Once the calculated volume exceeds the capacity of the last bag, even a small change can add another package.