Quick answer
One cubic yard is 27 cubic feet. Spread evenly, it covers 81 square feet at 4 inches deep or 54 square feet at 6 inches. A 10-by-10-foot slab at 4 inches needs 1.235 cubic yards before waste. Choose one bag size or request a ready-mix quote for the full volume.
Project tool checklist
- Concrete mixing tub
- Magnesium finishing trowel
- Tape measure
- Concrete mix
Quick reference table
Rectangular slabs, before waste. Each bag column is a separate whole-order option. Material budgets use $6.5 per 80 lb bag.
| Slab (ft) | Depth (in) | Volume (yd³) | 80 lb bags | 60 lb bags | Bag cost |
|---|---|---|---|---|---|
| 8 × 8 | 4 | 0.79 | 36 | 48 | $234 |
| 8 × 8 | 6 | 1.185 | 54 | 72 | $351 |
| 10 × 10 | 4 | 1.235 | 56 | 75 | $364 |
| 10 × 10 | 6 | 1.852 | 84 | 112 | $546 |
| 10 × 12 | 4 | 1.481 | 67 | 89 | $435.5 |
| 10 × 12 | 6 | 2.222 | 100 | 134 | $650 |
| 12 × 12 | 4 | 1.778 | 80 | 107 | $520 |
| 12 × 12 | 6 | 2.667 | 120 | 160 | $780 |
| 12 × 16 | 4 | 2.37 | 107 | 143 | $695.5 |
| 12 × 16 | 6 | 3.556 | 160 | 214 | $1,040 |
| 16 × 20 | 4 | 3.951 | 178 | 238 | $1,157 |
| 16 × 20 | 6 | 5.926 | 267 | 356 | $1,735.5 |
| 20 × 20 | 4 | 4.938 | 223 | 297 | $1,449.5 |
| 20 × 20 | 6 | 7.407 | 334 | 445 | $2,171 |
| 24 × 24 | 4 | 7.111 | 320 | 427 | $2,080 |
| 24 × 24 | 6 | 10.667 | 480 | 640 | $3,120 |
How to use the Concrete Calculator
- Measure the inside of the forms. Take depth readings in several places and use the average. For round forms record the inside diameter and fill height.
- Choose your units, enter the measured dimensions, and review the live drawing. Set a waste allowance and enter local prices.
- Compare the order volume with the yield on the bag. For a delivery, ask for a quote including any minimum-load fee.
Formula & engineering reference
For a slab or rectangular footing, multiply length (ft) by width (ft) by thickness (in) ÷ 12. For round columns multiply π × radius² × height × count, all lengths in feet. Multiply by the waste factor, then divide cubic feet by 27.
Project questions
How many bags cover a 10 × 10 slab at 4 inches?
Before waste, 33⅓ cubic feet takes 56 of the 80 lb bags or 75 of the 60 lb bags. At 10% extra, the counts become 62 and 82.
How should I measure a continuous footing?
Measure its cross-section and the length of the run. Split corners or stepped sections into nonoverlapping pieces before adding their volumes.
What if the slab is deeper at one edge?
Calculate the uniform slab first, then add the volume of the deepened strip below it. Counting the entire strip twice overstates the order.
How thick is one yard spread over a 12-by-12 pad?
A cubic yard spread over 144 square feet is 27 ÷ 144 × 12, or 2.25 inches thick. Use the thickness in your project design when estimating the actual pour.
Can I use the same formula for a round column?
A round form needs a circular base area. Square the inside radius, multiply by π, then multiply by fill height and the number of identical columns.