Quick answer
One cubic yard fills 27 cubic feet, or fifty-four half-cubic-foot gravel bags. Its weight depends on the aggregate and moisture. At the calculator’s 1.40 short tons per yard assumption, two yards weigh 2.80 short tons. Ask the quarry for its conversion before booking delivery by the ton.
Project tool checklist
- Steel bow rake
- Landscape marking paint
- Measuring tape
- Wheelbarrow
Quick reference table
Uniform, measured depth before order waste, settling or compaction. Crushed stone at 1.40 US short tons per cubic yard, with 0.50 ft³ bags.
| Area (sq ft) | Depth (in) | Volume (yd³) | Short tons | Retail bags |
|---|---|---|---|---|
| 100 | 2 | 0.617 | 0.86 | 34 |
| 100 | 3 | 0.926 | 1.3 | 50 |
| 100 | 4 | 1.235 | 1.73 | 67 |
| 250 | 2 | 1.543 | 2.16 | 84 |
| 250 | 3 | 2.315 | 3.24 | 125 |
| 250 | 4 | 3.086 | 4.32 | 167 |
| 500 | 2 | 3.086 | 4.32 | 167 |
| 500 | 3 | 4.63 | 6.48 | 250 |
| 500 | 4 | 6.173 | 8.64 | 334 |
| 1,000 | 2 | 6.173 | 8.64 | 334 |
| 1,000 | 3 | 9.259 | 12.96 | 500 |
| 1,000 | 4 | 12.346 | 17.28 | 667 |
| 2,000 | 2 | 12.346 | 17.28 | 667 |
| 2,000 | 3 | 18.519 | 25.93 | 1,000 |
| 2,000 | 4 | 24.691 | 34.57 | 1,334 |
| 5,000 | 2 | 30.864 | 43.21 | 1,667 |
| 5,000 | 3 | 46.296 | 64.81 | 2,500 |
| 5,000 | 4 | 61.728 | 86.42 | 3,334 |
How to use the Gravel Calculator
- Measure the footprint and finished average depth. Ask the yard whether the quoted density is for loose or compacted aggregate.
- Choose your units, enter the measured dimensions, and review the live drawing. Set a waste allowance and enter local prices.
- Compare bulk tons, loose yards or retail bags using the same grade. Keep delivery and any compaction allowance visible in your order.
Formula & engineering reference
Cubic yards = area (ft²) × depth (in) ÷ 324 × allowance. Short tons = cubic yards × selected bulk density (tons/yd³). Bag count = cubic yards × 27 ÷ labeled bag volume, rounded up.
Project questions
How much does a yard of crushed stone weigh?
The calculator’s crushed-stone example uses 1.40 US short tons per cubic yard. The quarry’s gradation, packing and moisture change the actual weight.
How deep does one yard cover 100 square feet?
Spread over 100 square feet, 27 cubic feet makes a uniform layer 3.24 inches deep before compaction.
Should I add the same allowance twice?
Keep an allowance for shrinkage separate from spillage. If the yard has already supplied a loose-to-compacted conversion, account for that adjustment once.
How much material fills a 10-by-20-foot path at 3 inches?
The layer is 50 cubic feet, or about 1.85 cubic yards. At 1.40 short tons per yard, it weighs about 2.59 tons before allowances.
How many retail bags make half a yard?
Half a cubic yard contains 13.5 cubic feet. If each bag holds 0.50 cubic feet, the order takes exactly 27 bags.