Quick answer
At a planning density of 145 pounds per cubic foot, 100 square feet of asphalt placed 3 inches thick weighs about 1.81 US short tons before waste. Thickness here means the finished compacted course. A plant’s job-mix density provides a better conversion when the supplier quotes by weight.
Project tool checklist
- Measuring wheel
- Marking paint
- Depth gauge
- Work gloves
Quick reference table
Examples use the displayed project presets, default product sizes and 10% order allowance. Costs use the calculator’s example unit rates in US dollars.
| Project preset | Main estimate | DIY materials | Installed budget |
|---|---|---|---|
| 30 × 10 ft | 5.98 tons | $568.22 | $1,800 |
| 50 × 12 ft | 11.96 tons | $1,136.44 | $3,600 |
| 60 × 20 ft | 23.92 tons | $2,272.87 | $7,200 |
How to use the Asphalt Calculator
- Measure the finished paved footprint and each specified compacted lift thickness. Keep the aggregate base outside the asphalt depth.
- Choose your units, enter the measured dimensions, and review the live drawing. Set a waste allowance and enter local prices.
- Ask the asphalt plant for the mix density and the paving contractor for delivery, preparation, equipment and minimum mobilization charges.
Formula & engineering reference
Tons = paved area (ft²) × compacted thickness (in) ÷ 12 × density (lb/ft³) ÷ 2,000 × (1 + waste fraction). Calculate surface and binder courses separately when they have different densities.
Project questions
Is a US ton the same as a metric tonne?
A US short ton is 2,000 lb, about 907.18 kg. A metric tonne is 1,000 kg. Confirm the unit on the plant ticket.
Do I enter loose or rolled depth?
Use compacted thickness with compacted density. Combining a loose lift height with compacted density overstates tonnage.
How do I handle a flared driveway entrance?
Split the entrance into rectangles and triangles. Sum their areas for each lift and apply that lift’s compacted thickness.
What would an extra inch of asphalt add to 400 square feet?
One added inch is 33⅓ cubic feet. At 145 lb per cubic foot that is roughly 2.42 extra US short tons before waste.
Can the estimator price demolition and disposal?
The material line estimates hot mix. A written installed rate can include removal if the contractor specifies that scope. Record haul-off and tipping fees separately when comparing bids.