Five backyard project budgets
Illustrative 2027 planning scenarios in US dollars. Materials and installed allowances are per unit shown, before unusual access, tax, permits or demolition. Replace the examples with written local bids.
| Project | Unit | DIY materials | Installed |
|---|---|---|---|
| Deck surface and basic framing | sq ft of deck | $12–$30 | $30–$70 |
| Wood privacy fence | linear ft | $12–$28 | $25–$55 |
| Segmental retaining wall | sq ft of face | $10–$25 | $25–$60 |
| Paver patio | sq ft of patio | $5–$12 | $12–$28 |
| Sod lawn | sq ft of lawn | $0.40–$1.00 | $1.00–$3.00 |
Sequence a spring project
| Work stage | Schedule dependency | Quantity to confirm |
|---|---|---|
| Design and utility location | Before excavation | Finished grades, boundaries and drainage routes |
| Earthwork and structural work | Before finish layers | Buried wall courses, footings, sub-base and haul-off |
| Hardscape and fence installation | After base and access are ready | Paver pattern, cap lengths and gate clearances |
| Soil, then sod | After heavy traffic ends | Final soil depth, pallet area and watering plan |
A worked paver example
A 12-by-16-foot patio has 192 square feet. At the illustrative $5–$12 material allowance, the starting range is $960–$2,304. An installed $12–$28 range gives $2,304–$5,376. Confirm whether base, edging, jointing material, drainage and soil disposal are included.
Identify what changes the price
An elevation change can add wall steps and drainage. A narrow gate can prevent machine access. A deck plan can require specified footings, hardware and guards. A field measurement gives area, while these details determine the applicable unit rate.
Order perishables last
Reserve staging space for base stone and block first. Plan deck and fence access before closing in the yard. Order sod only after grading is complete and a watering plan is ready, taking local planting conditions into account.